Rylee's Ace Hardware the Helpful Place

Three Locations to Serve You:

click to shop at Ace
click to check you Rewards Points
Share on facebook

Blog Catagories

Subscribe to Our Feed

Register to Comment on Our Blog

We love to hear from our customers. This form allows you to become a registered user of the Rylee's website. As a registered user, you will be able to see additional content on our website and make comments on our blog.



Blog Archive

Kick Breast Cancer To The Curb

Rylee's Ace Teams Up with the American Cancer Society To Fight Breast Cancer Click to Learn More

#000000

Ace's in the Kitchen

Ace's in the Kitchen is a cooking and learning program being offered exclusively at Rylee's Ace Hardware. Click to Learn More

#000000

Aura Paint Now at Rylee's

Get richer, more durable, and true color with Benjamin Moore Aura paint. Now Available to Rylee's. Click to Learn More

#000000

Make Your Garden Beautiful

We have everything you need to make your Flowers beautiful! Click to Learn More

#000000
http://www.ryleesace.com/components/com_gk2_photoslide/images/thumbm/111681P6040093.JPG
http://www.ryleesace.com/components/com_gk2_photoslide/images/thumbm/153731kitchen_banner_flat.png
http://www.ryleesace.com/components/com_gk2_photoslide/images/thumbm/521461painting2.jpg
http://www.ryleesace.com/components/com_gk2_photoslide/images/thumbm/631303greenhouse2.jpg
thumbnailthumbnailthumbnailthumbnail
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
PDF Print E-mail

The Building Continues At Michigan Street

Progress Made This Week 10/5/09 thru 10/9/09

The masons have been working on the main entrance. All of the joists are set. Decking will be complete Monday. The Electrician has been installing the interior underground pipe. Excavator installed top soil at the parking lot islands. Masons have started washing block. Roof blocking was installed. Electrician installed temp lights and power to the building. Excavators have started to level the interior floor. HVAC curbs were installed. Roofing material has started to arrive.

Work to Begin Next Week 10/12 thru 10/16

Complete structural steel and decking. Complete masonry. Start Roofing. Coninue with interior grading. Install roof drains and pipe. Continue interior electrical underground. Install irrigation north of the parking lot and the islands. Start on under floor drains. Continue interior plumbing underground.

 